On 1 October 2009 Mocca entered into a construction contract that was expected to take 27 months and therefore be completed on 31 December 2011. Details of the contract are:
Plant for use on the contract was purchased on 1 January 2010 (three months into the contract as it was not required at the start) at a cost of $8 million. The plant has a four-year life and after two years, when the contract is complete, it will be transferred to another contract at its carrying amount. Annual depreciation is calculated using the straight-line method (assuming a nil residual value) and charged to the contract on a monthly basis at 1/12 of the annual charge.
The correctly reported income statement results for the contract for the year ended 31 March 2010 were:
The percentage of completion is calculated as the agreed value of work completed as a percentage of the agreed contract price.
Required:
Calculate the amounts which would appear in the income statement and statement of financial position of Mocca, including the disclosure note of amounts due to/from customers, for the year ended/as at 31 March 2011 in respect of the above contract.
(10 marks)
Answer:
Mocca
Income statement year ended 31 March 2011
Copyright © 2000 - www.electedteal.com All Rights Reserved. 北京正保會計科技有限公司 版權所有
京B2-20200959 京ICP備20012371號-7 出版物經營許可證 京公網安備 11010802044457號
套餐D大額券
¥
去使用 主站蜘蛛池模板: 在线欧美| 999视频| 欧美中文日韩 | 韩日电影| 全部免费毛片在线播放网站 | 国产精品第 | 国产一区二区三区精品在线观看 | 欧美成人a交片免费看 | 日韩美女一区 | 99精品视频免费观看 | 久热综合 | 欧美国产三级 | 亚洲天堂2017 | 8x拔播拔播国产在线视频 | 五月激情综合网 | 国产精品一区二区久久 | 国产日韩精品视频一区二区三区 | 久久中文字幕免费视频 | 亚洲综合精品 | 精品成人免费一区二区在线播放 | 91免费国产在线 | 伊人伊人网 | 欧美日韩久久精品 | 国产成人精品免费视频大全最热 | 自拍偷拍一区二区三区 | 亚洲欧美在线播放 | 天天插天天狠 | av片在线看免费高清网站 | 久久久噜噜噜久久久 | 国产激情91久久精品导航 | 国产成人一区二区 | 毛片在线免费观看网站 | 欧美一级大片免费看 | 三级黄色网址 | 在线激情视频 | 国产精品自拍一区 | 中文字幕免费在线视频 | av在线电影免费观看 | 亚洲欧美成人网 | 免费国产视频 | 亚洲精品视频免费观看 |